Vibration Isolation Case Studies
DAEIL SYSTEMS engineers active vibration isolation systems for the world's most demanding nanoscale imaging and metrology environments.
Series
Equipment Type
Manufacturer
All Case Studies

East China University of Science and Technology STM DVIA-ML3000 (211119R4) Internal Program Performance — 2022.09.01
DVIA-ML3000 serial 211119R4 — East China University of Science and Technology, target equipment STM, Shanghai. Overview and VC-Class summary match the published form; MB3000 internal program performance plots (Z, X, Y) and Octave Band Result plots (Z, X, Y) are from the UI program. Cover and header graphics before the overview block are not republished.

SJ SEMI ZEISS CROSSBEAM 350 DVIA-ML1000 Installation Report
Jiangyin — ZEISS CROSSBEAM 350 on DVIA-ML1000 (220407R5): MB1000 programme + octave-band plots (2022-09-01).

Hongfujin Precision Electronics Chengdu ZEISS Sigma 500 DVIA-M1000 Installation Report (2022)
Chengdu site — ZEISS Sigma 500 on DVIA-M1000 (SN 220328R6). Cover summary, measurement notes, and three-axis MB1000 internal-program performance plots.

ZEISS EVO15 DVIA-M1000 Internal Program Performance Report — Carl Zeiss (Guangzhou, 2022)
Guangzhou field worksheet (serial 220324R5): Z/X/Y-axis MB1000 internal-program screenshots (transmissibility and coherence) embedded in the report; title-block ornaments from the DOCX source are omitted from publication.

Hitachi SU8230 DVIA-M1000 Installation Report — Shanghai University / Guangzhou (2022-08-24)
Serial 220118R7, measurement 2022.08.24 — MB1000 internal program Z / X / Y performance captures (pre-Overview DOCX graphics omitted from the public page).

CRRC Qishuyan Locomotive & Rolling Stock Technology Research Institute ZEISS SIGMA 300 DVIA-UB1000 (220302R3) Installation Report — Changzhou
DVIA-UB1000 compact installation worksheet (serial 220302R3) for ZEISS SIGMA 300 at CRRC Qishuyan Locomotive & Rolling Stock Technology Research Institute Co., Ltd., CHANGZHOU. Setup 22.08.05, reporting 22.08.11, business-trip line 17.12.27~17.12.29; Overview measurement dated 2022.08.05 (Monday). Publication includes setup photograph and U1000 internal-program Z / X / Y axis screenshots. Decorative header bitmap (image1) omitted.