Gotion High-tech Hefei ThermoFisher Apreo 2S Hivac FIB-SEM DVIA-M1000 (240315R4) Installation Report
DVIA-M1000 installation report (serial 240315R4) for Gotion High-tech in Hefei, China. Overview states the platform is appropriately installed and functioning as intended. ThermoFisher FIB-SEM Apreo 2S Hivac; equipment condition The equipment is installed/Turned off. The published form has no separate vibration specification section or measurement summary table. Tuning Request UI capture and vertical / left-to-right / front-to-back transmissibility plots; no on-site equipment photo in the source report. Reference uses the standard VC criterion markdown table.

West Lake University Thermo Fisher Helios 5 Hydra DVIA-M1000 (230908R3-2) Installation Report — 2024.06.20
DVIA-M1000 serial 230908R3-2 — West Lake University (Hangzhou), Thermo Fisher Helios 5 Hydra. Handout covers set-up and reporting on 24.06.20 with internal-program performance plots for Vertical, Left to Right, and Front to Back; equipment/site photo after the title block.

Thermo Fisher Scientific Helios 5 UX DVIA-M1000 (230908R3-3) Installation Report
DVIA-M1000 internal-program worksheet (serial 230908R3-3) for a Thermo Fisher Helios 5 UX. Setup and reporting dated 24.06.20; measurement date 2024.06.17 (Monday) with operator Byeonghun Cho from DAEIL SYSTEMS. The form leaves END USER and place of installation unstated—the public page mirrors those cells as N/A. Overview uses the standard DVIA-M1000 wording; vibration limits appear only as the **Vibration Spec** screenshot. Performance plots follow the Vertical, Left to Right, and Front to Back captions from the worksheet.

Unisoku USM1400SA DVIA-M-UST1 (230426R1-3) M1000 Internal Program Measurement (2024-06-18)
DVIA-M-UST1 serial M-UST1·230426R1-3 handout-style worksheet with Target equipment UnisokoUSM1400SA, Remark Good Performance, and reporting block Operator Byeonghun Cho with setup and reporting 24.06.12 and business trip 17.12.27~17.12.29. Overview matches the standard DVIA-M-UST1 sentence; measurement dated Tuesday 2024-06-18 per worksheet layout (file label 24.06.18). Place of installation, END USER, and place of measurement are unstated on the form (N/A). Published captures under “M1000 internal program performance measurement result”: Vertical, Left to Right, and Front to Back. Decorative JPEG under the Word title line is omitted from public copy.

Unisoku USM1400SA DVIA-M-UST1 Installation Report (230426R1-3)
Unisoku USM1400SA on DVIA-M-UST1 (230426R1-3): M1000 internal program performance — Vertical, Left to Right, Front to Back.

DVIA-M-UST1 (230921R3) M1000 Internal Program Performance Setup Handout
Abbreviated setup handout for serial 230921R3 with DVIA-M-UST1 wording per source (M1000 internal program worksheet). Reporting block lists operator Byeonghun Cho, setup 24.06.12, reporting 24.06.12, business trip 17.12.27~17.12.29. Overview states the platform is appropriately installed and functioning as intended. Measurement dated 2024.06.18 (Tuesday); place of measurement and equipment model are unstated on the form (N/A). Target equipment / place of installation / END USER blank (N/A). Remark Good Performance per table. Published figures: Vertical, Left to Right, and Front to Back captures under “M1000 internal program performance measurement result.” Decorative JPEG under the Word title ribbon is omitted from public copy.