Skip to main content
Installation Report
DVIA-M Series
06-18-2024

Unisoku USM1400SA DVIA-M-UST1 (230426R1-3) M1000 Internal Program Measurement (2024-06-18)

DVIA-M Series
Installation Report
DVIA-M-UST1
M-UST1
230426R1-3
Unisoku
USM1400SA
M1000
M1000 internal program

Cover

(M-UST1_ 230426R1-3 Set-up)

Installation handout information

FieldValue
Target equipmentUnisokuUSM1400SA
Place of installationN/A
RemarkGood Performance
END USERN/A

Reporting and trip schedule

Operator: Byeonghun Cho

Date of setup: 24.06.12

Date of reporting: 24.06.12

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M-UST1 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

Measurement date: 2024.06.18 (Tuesday)

Operator: Byeonghun Cho from DAEIL SYSTEMS

Place of measurement

N/A

Equipment Model

Unisoku USM1400SA

5.

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date06-18-2024
Tags
DVIA-M Series
Installation Report
DVIA-M-UST1
M-UST1
230426R1-3
Unisoku
USM1400SA
M1000
M1000 internal program