Skip to main content
Installation Report
DVIA-M Series
06-18-2024

Unisoku USM1400SA DVIA-M-UST1 Installation Report (230426R1-3)

DVIA-M Series
Installation Report
Unisoku
USM1400SA
DVIA-M-UST1
230426R1-3

Target equipment

UnisokuUSM1400SA

Place of installation

N/A

Remark

Good Performance

End user

N/A

Operator

Byeonghun Cho

Date of setup

24.06.12

Date of reporting

24.06.12

Date of business trip

17.12.27~17.12.29

Overview

The DVIA-M-UST1 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2024.06.18 (Tuesday)

Measurement operator

Byeonghun Cho from DAEIL SYSTEMS

Place of measurement

N/A

Equipment Model

Unisoku USM1400SA

5.

M1000 internal program performance measurement result

Data and Image

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date06-18-2024
Tags
DVIA-M Series
Installation Report
Unisoku
USM1400SA
DVIA-M-UST1
230426R1-3