Installation Report
DVIA-M Series
06-05-2024
University of Science and Technology of China (Hefei) Unisoku USM1400SA DVIA-M-SOST (230818R6-1) Internal Program — 2024.06.05
DVIA-M Series
Installation Report
University of Science and Technology of China
Hefei
Unisoku
USM1400SA
DVIA-M-SOST
230818R6-1
Contents
(M-SOST_ 230818R6-1 Set-up)
| Target equipment | Unisoku USM1400SA |
|---|---|
| Place of installation | 合肥 |
| Remark | Good Performance |
| END USER | 中科大(合肥) |
| Operator: Chaewon Lee, Byeonghun Cho Date of setup: 24.06.05 Date of reporting: 24.06.05 | Date of business trip : 17.12.27~17.12.29 |
Overview
The DVIA-M-SOST active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2024.06.05 (Wednesday)
Operator
Operator: Chaewon Lee, Byeonghun Cho from DAEIL SYSTEMS
Place of measurement
合肥
Equipment Model
Equipment Model: Unisoku
5.
M1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date06-05-2024
Tags
DVIA-M Series
Installation Report
University of Science and Technology of China
Hefei
Unisoku
USM1400SA
DVIA-M-SOST
230818R6-1
Related Case Studies

DVIA-M Series
Unisoku USM1400SA STM DVIA-M-UST1 (230426R1-3) Installation Report
08-12-2024Read more

DVIA-M Series
Unisoku USM1400SA DVIA-M-UST1 (230426R1-3) M1000 Internal Program Measurement (2024-06-18)
06-18-2024Read more

DVIA-M Series
Unisoku USM1400SA DVIA-M-UST1 Installation Report (230426R1-3)
06-18-2024Read more