Installation Report
DVIA-M Series
06-05-2024

University of Science and Technology of China (Hefei) Unisoku USM1400SA DVIA-M-SOST (230818R6-1) Internal Program — 2024.06.05

DVIA-M Series
Installation Report
University of Science and Technology of China
Hefei
Unisoku
USM1400SA
DVIA-M-SOST
230818R6-1

(M-SOST_ 230818R6-1 Set-up)

Target equipmentUnisoku USM1400SA
Place of installation合肥
RemarkGood Performance
END USER中科大(合肥)
Operator: Chaewon Lee, Byeonghun Cho Date of setup: 24.06.05 Date of reporting: 24.06.05Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M-SOST active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2024.06.05 (Wednesday)

Operator

Operator: Chaewon Lee, Byeonghun Cho from DAEIL SYSTEMS

Place of measurement

合肥

Equipment Model

Equipment Model: Unisoku

5.

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date06-05-2024
Tags
DVIA-M Series
Installation Report
University of Science and Technology of China
Hefei
Unisoku
USM1400SA
DVIA-M-SOST
230818R6-1