Installation Report
DVIA-M Series
12-09-2020
ZOLIX remote tuning — Nanjing University High-power Telescope DVIA-MB1000 (200914R2 P206) — 2020.12.09
DVIA-M Series
Installation Report
ZOLIX
DVIA-MB1000
200914R2
P206
MB1000 internal program
Nanjing University
remote tuning
Contents
(MB1000_200914R2(P206) Set up)
Target equipment
High-power Telescope
Place of installation
Nanjing University
Remark
Good Performance
END USER
Nanjing University
Operator
Munho Noh
Date of setup
20.12.09
Date of reporting
20.12.09
Date of business trip
17.12.27~17.12.29
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 20.12.09 (WED)
Operator: Daeil System, Research engineer Munho Noh
Place of measurement
Nanjing University
Equipment Model
Unknown
Summary of measurement results
| Direction | 2 Hz | 5 Hz | 10 Hz |
|---|---|---|---|
| Z | -24.68 dB | -35.70 dB | -32.26 dB |
| X | -28.89 dB | -28.50 dB | -41.47 dB |
| Y | -29.15 dB | -37.47 dB | -39.45 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-09-2020
Tags
DVIA-M Series
Installation Report
ZOLIX
DVIA-MB1000
200914R2
P206
MB1000 internal program
Nanjing University
remote tuning
Related Case Studies

DVIA-M Series
ZOLIX DVIA-MO1000 (200914R2, P206) Remote Tuning Installation Report — November 19, 2020
11-19-2020Read more

DVIA-M Series
ZOLIX Shanghai Institute of Technology and Technology Three-axis Vibration Exciter DVIA-MB1000 (220330R5-3) Installation Report
05-16-2026Read more

DVIA-M Series
ZOLIX DVIA-MB1000 (220330R5-3) Shanghai Institute Installation Report
05-16-2026Read more