Installation Report
DVIA-M Series
05-15-2026
DVIA-MB1000 (230501R3-3) Installation Report
DVIA-M Series
Installation Report
DVIA-MB1000
230501R3-3
MB1000 internal program
Contents
(MB1000_ 230501R3-3 Set-up)
Target equipment
N/A
Place of installation
N/A
Remark
Good Performance
END USER
N/A
Operator
Operator: Chaewon Lee Date of setup: 23.11.14 Date of reporting: 24.07.05
Date of business trip
Date of business trip : 17.12.27~17.12.29
Overview
Overview The DVIA-MB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023. 11.14(Tuesday) Operator: Chaewon Lee from DAEIL SYSTEMS Place of measurement: Equipment Model: 5.
M1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-15-2026
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
230501R3-3
MB1000 internal program
Related Case Studies

DVIA-M Series
ZOLIX remote tuning — Nanjing University High-power Telescope DVIA-MB1000 (200914R2 P206) — 2020.12.09
12-09-2020Read more

DVIA-M Series
ZEISS Sigma 300 VP DVIA-MB1000 (220121R3) Shanghai Installation Report
05-16-2026Read more

DVIA-M Series
SNU Precision DUAL BEAM DVIA-MB1000 (220216R3) Installation Report
05-16-2026Read more