Skip to main content
Installation Report
DVIA-M Series
05-15-2026

DVIA-MB1000 (230501R3-3) Installation Report

DVIA-M Series
Installation Report
DVIA-MB1000
230501R3-3
MB1000 internal program

(MB1000_ 230501R3-3 Set-up)

Target equipment

N/A

Place of installation

N/A

Remark

Good Performance

END USER

N/A

Operator

Operator: Chaewon Lee Date of setup: 23.11.14 Date of reporting: 24.07.05

Date of business trip

Date of business trip : 17.12.27~17.12.29

Overview

Overview The DVIA-MB1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023. 11.14(Tuesday) Operator: Chaewon Lee from DAEIL SYSTEMS Place of measurement: Equipment Model: 5.

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date05-15-2026
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
230501R3-3
MB1000 internal program