Installation Report
DVIA-M Series
03-04-2025
Fudan University JEOL STEM ARM200 DVIA-MB3000 (241021R4) Installation Report — 2025.03.04
DVIA-M Series
Installation Report
Fudan University
JEOL
STEM
ARM200
DVIA-MB3000
241021R4
Shanghai
Contents
Fudan University
(MB3000_ 241021R4 Set up)
| Target equipment | JEOL ARM200 |
|---|---|
| Place of installation | Shanghai |
| Remark | Good Performance |
| END USER | Fudan University |
Operator: Chaewon Lee, Jonghwa Suh
Date of setup: 25.03.04
Date of reporting: 25.03.04
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-MB3000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2025.03.04 (Tuesday)
Operator: DAEIL SYSTEMS Chaewon Lee, Jonghwa Suh
End User: Fudan University
Place of measurement: Shanghai
Equipment Model:
Manufacturer: JEOL
Equipment: STEM
Model: ARM200
5.
MB3000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date03-04-2025
Tags
DVIA-M Series
Installation Report
Fudan University
JEOL
STEM
ARM200
DVIA-MB3000
241021R4
Shanghai
Related Case Studies

DVIA-M Series
Fudan University JEOL STEM JEM-ARM200F DVIA-M1000 (241021R4) Installation Report
06-20-2025Read more

DVIA-M Series
Fudan University JEOL F200 — DVIA-MB3000 (241017R1) Installation Report — 2025.03.04
03-04-2025Read more

DVIA-ML Series
Fudan University JEOL STEM ARM200 DVIA-ML3000 (241021R4) Installation Report
03-04-2025Read more