Installation Report
DVIA-M Series
03-04-2025
Fudan University JEOL F200 — DVIA-MB3000 (241017R1) Installation Report — 2025.03.04
DVIA-M Series
Installation Report
Fudan University
JEOL
F200
DVIA-MB3000
241017R1
MB3000 internal program
Contents
(MB3000_ 241017R1 Set up)
Target equipment
JEOL F200
Place of installation
Shanghai
Remark
Good Performance
End User
Fudan University
Operator
Chaewon Lee, Jonghwa Suh
Date of setup
25.03.04
Date of reporting
25.03.04
Date of business trip
17.12.27~17.12.29
Overview
The DVIA-MB3000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
Measurement date: 2025.03.04 (Tuesday)
Operator: DAEIL SYSTEMS Chaewon Lee, Jonghwa Suh
Place of measurement
Shanghai
Equipment Model
Manufacturer: JEOL
Equipment: TEM
Model: F200
MB3000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date03-04-2025
Tags
DVIA-M Series
Installation Report
Fudan University
JEOL
F200
DVIA-MB3000
241017R1
MB3000 internal program
Related Case Studies

DVIA-M Series
Fudan University JEOL STEM ARM200 DVIA-MB3000 (241021R4) Installation Report — 2025.03.04
03-04-2025Read more
DVIA-M Series
Tier-1 Semiconductor JEOL F200 DVIA-MB3000 (200916R1) Installation Report — 2020.12.22
12-22-2020Read more

DVIA-M Series
Fudan University JEOL STEM JEM-ARM200F DVIA-M1000 (241021R4) Installation Report
06-20-2025Read more