Skip to main content
Installation Report
DVIA-M Series
03-05-2024

Bangxin Semiconductor Hitachi Regulus8100 DVIA-M1000 (231205R5) Installation Report

DVIA-M Series
Installation Report
Bangxin Semiconductor
Shanghai
DVIA-M1000
231205R5
Hitachi
Regulus8100

Bangxin Semiconductor

上海邦芯半导体科技有限公司

(M1000_ 231205R5 Set up)

Site checklist

Target equipmentHitachi Regulus8100
Place of installation上海
RemarkGood Performance
END USER上海邦芯半导体科技有限公司

Operator and dates

Operator: Lee, Chaewon

Date of setup: 24.03.05

Date of reporting: 24.03.21

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.03.05 (Tuesday)

Operator: DAEIL SYSTEMS Chaewon Lee

Place of measurement: 上海

Equipment Model: Hitachi Regulus8100

5.

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date03-05-2024
Tags
DVIA-M Series
Installation Report
Bangxin Semiconductor
Shanghai
DVIA-M1000
231205R5
Hitachi
Regulus8100