Installation Report
DVIA-M Series
03-05-2024
Bangxin Semiconductor Hitachi Regulus8100 DVIA-M1000 (231205R5) Installation Report
DVIA-M Series
Installation Report
Bangxin Semiconductor
Shanghai
DVIA-M1000
231205R5
Hitachi
Regulus8100
Contents
Bangxin Semiconductor
上海邦芯半导体科技有限公司
(M1000_ 231205R5 Set up)
Site checklist
| Target equipment | Hitachi Regulus8100 |
|---|---|
| Place of installation | 上海 |
| Remark | Good Performance |
| END USER | 上海邦芯半导体科技有限公司 |
Operator and dates
Operator: Lee, Chaewon
Date of setup: 24.03.05
Date of reporting: 24.03.21
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.03.05 (Tuesday)
Operator: DAEIL SYSTEMS Chaewon Lee
Place of measurement: 上海
Equipment Model: Hitachi Regulus8100
5.
M1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date03-05-2024
Tags
DVIA-M Series
Installation Report
Bangxin Semiconductor
Shanghai
DVIA-M1000
231205R5
Hitachi
Regulus8100
Related Case Studies

DVIA-M Series
Shanghai Jiao Tong University Hitachi SU8600 FE-SEM DVIA-M1000 (250320R3) Installation Report
04-13-2026Read more

DVIA-M Series
Hitachi SU7000 DVIA-M1000 (230818R3) Donghua University Setup Handout
05-07-2024Read more

DVIA-M Series
Hitachi FE-SEM SU8600 DVIA-M1000 Internal Program Performance Report — Toyota, Shanghai (2023)
11-28-2023Read more