Installation Report
DVIA-M Series
05-07-2024
Hitachi SU7000 DVIA-M1000 (230818R3) Donghua University Setup Handout
DVIA-M Series
Installation Report
Donghua University
Hitachi
SU7000
DVIA-M1000
230818R3
Shanghai
Contents
Cover
DONGHUA UNIVERSITY
(M1000_ 230818R3 Set up)
Equipment photo
Installation handout information
| Field | Value |
|---|---|
| Target equipment | HITACHI SU7000 |
| Place of installation | Shanghai |
| Remark | Good Performance |
| END USER | Donghua University |
Reporting and trip schedule
Operator: Lee, Chaewon
Date of setup: 24.05.07
Date of reporting: 24.05.07
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2024.05.07 (Tuesday)
Operator: DAEIL SYSTEMS, Chaewon Lee
Place of measurement
Shanghai
Equipment Model
HITACHI SU7000
M1000 internal program performance measurement result
Vertical
Left to Right
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-07-2024
Tags
DVIA-M Series
Installation Report
Donghua University
Hitachi
SU7000
DVIA-M1000
230818R3
Shanghai
Related Case Studies

DVIA-M Series
Donghua University HITACHI SU7000 DVIA-M1000 (230706R2) Installation Report
12-04-2024Read more

DVIA-M Series
Shanghai Jiao Tong University Hitachi SU8600 FE-SEM DVIA-M1000 (250320R3) Installation Report
04-13-2026Read more

DVIA-M Series
Bangxin Semiconductor Hitachi Regulus8100 DVIA-M1000 (231205R5) Installation Report
03-05-2024Read more