Installation Report
DVIA-M Series
12-04-2024
Donghua University HITACHI SU7000 DVIA-M1000 (230706R2) Installation Report
DVIA-M Series
Installation Report
Donghua University
DVIA-M1000
230706R2
HITACHI
SU7000
Shanghai
FE-SEM
Contents
Donghua University
Donghua University
(M1000_ 230706R2 Set-up)
Site checklist
| Target equipment | HITACHI SU7000 |
|---|---|
| Place of installation | Shanghai |
| Remark | Good Performance |
| END USER | Donghua University |
Operator and dates
Operator: Chaewon Lee
Date of setup: 24.08.19
Date of reporting: 24.12.04
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.08.19 (Monday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement: Shanghai
End user: Donghua university
Equipment Model:
Manufacturer: HITACHI
Equipment: FE-SEM
Model: SU7000
5.
M1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date12-04-2024
Tags
DVIA-M Series
Installation Report
Donghua University
DVIA-M1000
230706R2
HITACHI
SU7000
Shanghai
FE-SEM
Related Case Studies

DVIA-M Series
Hitachi SU7000 DVIA-M1000 (230818R3) Donghua University Setup Handout
05-07-2024Read more

DVIA-M Series
Shanghai Jiao Tong University Hitachi SU8600 FE-SEM DVIA-M1000 (250320R3) Installation Report
04-13-2026Read more

DVIA-M Series
YIMO Zeiss FE-SEM Sigma360 DVIA-M1000 (250102R2-4) Installation Report
04-30-2025Read more