Installation Report
DVIA-M Series
05-15-2026
Zhongke Ecomi DVIA-M-AST Internal Program Measurement (231025R2) — Beijing
DVIA-M Series
Installation Report
Zhongke Ecomi
Beijing
DVIA-M-AST
231025R2
Contents
Zhongke Ecomi
Target equipment: -
Place of installation: Beijing
Remark: Good Performance
END USER: Ecomi
(MB1000_ 2312025R2 Set-up)
Overview
Overview The DVIA-M-AST active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2024.05.16(Thursday) Operator: Chaewon Lee from DAEIL SYSTEMS Place of measurement: Beijing Equipment Model: N/A
Operator: Byeonghun Cho Date of setup: 24.05.30 Date of reporting: 24.07.05
Date of business trip : 17.12.27~17.12.29
M-AST internal program performance measurement result
Vertical
Left to Right
Front to Back
Reference
Generic Vibration Criteria
Notes:
- As measured in one-third octave bands over 8-80 Hz (VC-A/B) or 1-80 Hz (VC-C through VC-G).
- Detail size refers to width in microelectronics fabrication or particle size in medical research.
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-15-2026
Tags
DVIA-M Series
Installation Report
Zhongke Ecomi
Beijing
DVIA-M-AST
231025R2
Related Case Studies

DVIA-M Series
Zhongke Ecomi DVIA-M1000 Internal Program Measurement (231025R2) — Beijing
05-15-2026Read more

DVIA-M Series
Fuchuang Precision Semiconductor ZEISS Sigma 360 FE-SEM DVIA-ML1000 (260203R3) Installation Report
05-11-2026Read more

DVIA-M Series
YIMO Omicron STM DVIA-M1000 (2309050R3) Installation Report — Beijing Academy of Quantum Information Sciences
01-23-2026Read more