Installation Report
DVIA-M Series
05-15-2026
Zhongke Ecomi DVIA-M1000 Internal Program Measurement (231025R2) — Beijing
DVIA-M Series
Installation Report
Zhongke Ecomi
Beijing
DVIA-M1000
231025R2
Contents
Zhongke Ecomi
Target equipment: -
Place of installation: Beijing
Remark: Good Performance
END USER: Zhongke Ecomi
(M-AST_ 230825R2)
Overview
Operator: Chaewon Lee Date of setup: 24.08.29 Date of reporting: 24.09.09
Date of business trip : 17.12.27~17.12.29
Overview The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2024.08.29(Thursday) Operator: Chaewon Lee from DAEIL SYSTEMS Place of measurement: Zhongke Ecomi Equipment Model: 5.
M-AST internal program performance measurement result
Vertical
Left to Right
Front to Back
Reference
Generic Vibration Criteria
Notes:
- As measured in one-third octave bands over 8-80 Hz (VC-A/B) or 1-80 Hz (VC-C through VC-G).
- Detail size refers to width in microelectronics fabrication or particle size in medical research.
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-15-2026
Tags
DVIA-M Series
Installation Report
Zhongke Ecomi
Beijing
DVIA-M1000
231025R2
Related Case Studies

DVIA-M Series
Zhongke Ecomi DVIA-M-AST Internal Program Measurement (231025R2) — Beijing
05-15-2026Read more

DVIA-M Series
YIMO Omicron STM DVIA-M1000 (2309050R3) Installation Report — Beijing Academy of Quantum Information Sciences
01-23-2026Read more
DVIA-M Series
Chinese Academy of Sciences Institute of Semiconductors Thermo Fisher Helios 5 CX DVIA-M1000 (250619R4) Installation Report
09-01-2025Read more