Skip to main content
Installation Report
DVIA-M Series
07-05-2024

Xi'an Jiaotong University ZEISS Sigma 300 DVIA-M1000 (231009R3) Installation Report

DVIA-M Series
Installation Report
Xi'an Jiaotong University
DVIA-M1000
231009R3
ZEISS
Sigma300
SEM
Xi'an

Xi'an Jiaotong University

Xi'an Jiaotong University

(M1000_ 231009R3 Set-up)

Site checklist

Target equipmentZEISS Sigma300
Place of installationXi'an
RemarkGood Performance
END USERXi'an Jiaotong University

Operator and dates

Operator: Chaewon Lee

Date of setup: 24.03.22

Date of reporting: 24.07.05

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.03.15(Wednesday)

Operator: Chaewon Lee from DAEIL SYSTEMS

Place of measurement: Xi'an Jiaotong University

Equipment Model: N/A

Manufacturer: ZEISS

Equipment: SEM

Model: Sigma300

5.

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-05-2024
Tags
DVIA-M Series
Installation Report
Xi'an Jiaotong University
DVIA-M1000
231009R3
ZEISS
Sigma300
SEM
Xi'an