Installation Report
DVIA-M Series
10-26-2023

Sigma 300 DVIA-M1000 (230818R4) Dongguan Haoxing Setup Handout

DVIA-M Series
Installation Report
Dongguan
Sigma 300
DVIA-M1000
230818R4

Cover

Dongguan Haoxing Precision Electroplating Co., Ltd.

(M1000_ 230818R4 Set up)

Equipment photo

Installation handout information

FieldValue
Target equipmentSigma 300
Place of installationDongguan
RemarkGood Performance
END USERDongguan Haoxing Precision Electroplating Co., Ltd.

Reporting and trip schedule

Operator: Park, Jongwon

Date of setup: 23.10.25

Date of reporting: 23.10.26

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2023.10.25 (Wednesday)

Operator: DAEIL SYSTEMS Jongwon Park

Place of measurement

Dongguan

Equipment Model

Sigma 300

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date10-26-2023
Tags
DVIA-M Series
Installation Report
Dongguan
Sigma 300
DVIA-M1000
230818R4