Installation Report
DVIA-M Series
10-26-2023
Sigma 300 DVIA-M1000 (230818R4) Dongguan Haoxing Setup Handout
DVIA-M Series
Installation Report
Dongguan
Sigma 300
DVIA-M1000
230818R4
Contents
Cover
Dongguan Haoxing Precision Electroplating Co., Ltd.
(M1000_ 230818R4 Set up)
Equipment photo
Installation handout information
| Field | Value |
|---|---|
| Target equipment | Sigma 300 |
| Place of installation | Dongguan |
| Remark | Good Performance |
| END USER | Dongguan Haoxing Precision Electroplating Co., Ltd. |
Reporting and trip schedule
Operator: Park, Jongwon
Date of setup: 23.10.25
Date of reporting: 23.10.26
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2023.10.25 (Wednesday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement
Dongguan
Equipment Model
Sigma 300
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date10-26-2023
Tags
DVIA-M Series
Installation Report
Dongguan
Sigma 300
DVIA-M1000
230818R4
Related Case Studies

DVIA-M Series
YIMO ZEISS FE-SEM Sigma 300 DVIA-M1000 (250131R1) Installation Report
02-20-2025Read more

DVIA-M Series
CNITECH ZEISS FE-SEM Sigma 300 DVIA-M1000 (230908R2-2) Installation Report
01-16-2024Read more

DVIA-M Series
Guangdong Jiashang Solaris GMH DVIA-M1000 (230809R2) Installation Report
11-03-2023Read more