Installation Report
DVIA-M Series
11-03-2023
Guangdong Jiashang Solaris GMH DVIA-M1000 (230809R2) Installation Report
DVIA-M Series
Installation Report
Guangdong Jiashang
Solaris GMH
DVIA-M1000
230809R2
Dongguan
Contents
Guangdong Jiashang New Energy Tech Co., Ltd.
(M1000_ 230809R2 Set up)
Site checklist
| Target equipment | Solaris GMH |
|---|---|
| Place of installation | Dongguan |
| Remark | Good Performance |
| END USER | Guangdong Jiashang New Energy Tech Co., Ltd. |
Operator and dates
Operator: Park, Jongwon
Date of setup: 23.11.02
Date of reporting: 23.11.03
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.11.02 (Thursday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Dongguan
Equipment Model: Solaris GMH
5.
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date11-03-2023
Tags
DVIA-M Series
Installation Report
Guangdong Jiashang
Solaris GMH
DVIA-M1000
230809R2
Dongguan
Related Case Studies

DVIA-M Series
Huawei Solaris GMH DVIA-M1000 Installation Report (230509R6-2)
11-01-2023Read more

DVIA-M Series
Sigma 300 DVIA-M1000 (230818R4) Dongguan Haoxing Setup Handout
10-26-2023Read more

DVIA-M Series
Guangdong Everwin Precision Technology Sigma300 DVIA-M1000 (230310R4) Installation Report
07-24-2023Read more