Skip to main content
Installation Report
DVIA-M Series
11-03-2023

Guangdong Jiashang Solaris GMH DVIA-M1000 (230809R2) Installation Report

DVIA-M Series
Installation Report
Guangdong Jiashang
Solaris GMH
DVIA-M1000
230809R2
Dongguan

Guangdong Jiashang New Energy Tech Co., Ltd.

(M1000_ 230809R2 Set up)

Site checklist

Target equipmentSolaris GMH
Place of installationDongguan
RemarkGood Performance
END USERGuangdong Jiashang New Energy Tech Co., Ltd.

Operator and dates

Operator: Park, Jongwon

Date of setup: 23.11.02

Date of reporting: 23.11.03

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.11.02 (Thursday)

Operator: DAEIL SYSTEMS Jongwon Park

Place of measurement: Dongguan

Equipment Model: Solaris GMH

5.

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date11-03-2023
Tags
DVIA-M Series
Installation Report
Guangdong Jiashang
Solaris GMH
DVIA-M1000
230809R2
Dongguan