Installation Report
DVIA-M Series
01-16-2024
CNITECH ZEISS FE-SEM Sigma 300 DVIA-M1000 (230908R2-2) Installation Report
DVIA-M Series
Installation Report
CNITECH
ZEISS
FE-SEM
Sigma 300
DVIA-M1000
230908R2-2
Ningbo
Contents
Overview
CNITECH
(M1000_ 230908R2-2 Set up)
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.01.11 (Thursday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Ningbo
Equipment Model: ZEISS FE-SEM Sigma 300
Target equipment: Sigma 300
Place of installation: Ningbo
Remark: Good Performance
END USER: CNITECH
Operator: Park, Jongwon
Date of setup: 24.01.11
Date of reporting: 24.01.16
Date of business trip: 17.12.27~17.12.29
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date01-16-2024
Tags
DVIA-M Series
Installation Report
CNITECH
ZEISS
FE-SEM
Sigma 300
DVIA-M1000
230908R2-2
Ningbo
Related Case Studies

DVIA-M Series
YIMO ZEISS FE-SEM Sigma 300 DVIA-M1000 (250131R1) Installation Report
02-20-2025Read more

DVIA-M Series
TESCAN SEM MAGNA DVIA-M1000 (230908R2-1) Installation Report
05-15-2026Read more

DVIA-M Series
ZEISS Sigma360 FE-SEM DVIA-M1000 (231205R4) Installation Report — Guizhou Phosphate
05-15-2026Read more