Skip to main content
Installation Report
DVIA-M Series
10-10-2023

Wuxi DK Electronic Materials Flex1000 DVIA-M1000 (230801R2) Internal Program Performance — 2023.10.10

DVIA-M Series
Installation Report
Wuxi DK Electronic Materials
Flex1000
Shanghai
DVIA-M1000
230801R2

(M1000_ 230801R2 Set up)

Target equipmentFlex1000
Place of installationshanghai
RemarkGood Performance
END USERWuxi DK Electronic Materials Co., Ltd.
Operator: Lee, SangjaeDate of business trip : 17.12.27~17.12.29
Date of setup: 23.10.10
Date of reporting: 23.10.17

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2023.10.10 (Tuesday)

Operator

Operator: DAEIL SYSTEMS Sangjae Lee

Place of measurement

Shanghai

Equipment Model

Flex1000

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date10-10-2023
Tags
DVIA-M Series
Installation Report
Wuxi DK Electronic Materials
Flex1000
Shanghai
DVIA-M1000
230801R2