Hubei Youxing New Energy Sigma 300 DVIA-M1000 (230703R1) Installation Report

DVIA-M Series
Installation Report
Hubei Youxing New Energy Technology
Sigma 300
DVIA-M1000
230703R1
China

Overview

Target equipmentSigma 300
Place of installationHubei
RemarkGood Performance
END USERHubei Youxing New Energy Technology Co., Ltd.
Operator: Lee, Sangjae Date of setup: 23.10.10 Date of reporting: 23.10.17Date of business trip : 17.12.27~17.12.29
Overview The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.10.10 (Tuesday) Operator: DAEIL SYSTEMS Sangjae Lee Place of measurement: Hubei Equipment Model: Sigma 3005.

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date10-17-2023
Tags
DVIA-M Series
Installation Report
Hubei Youxing New Energy Technology
Sigma 300
DVIA-M1000
230703R1
China