Installation Report
DVIA-M Series
10-31-2023
Dow Chemical Sigma 300 DVIA-M1000 (230328R3) Installation Report
DVIA-M Series
Installation Report
Dow Chemical
DVIA-M1000
230328R3
Sigma 300
Shanghai
Contents
Dow Chemical
Dow Chemical
(M1000_ 230328R3 Set up)
Site checklist
| Target equipment | Sigma 300 |
|---|---|
| Place of installation | Shanghai |
| Remark | Good Performance |
| END USER | Dow Chemical |
Operator and dates
Operator: Lee, Sangjae
Date of setup: 23.10.31
Date of reporting: 23.10.31
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.10.31 (Tuesday)
Operator: DAEIL SYSTEMS Sangjae Lee
Place of measurement: Shanghai
Equipment Model: Sigma 300
5.
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date10-31-2023
Tags
DVIA-M Series
Installation Report
Dow Chemical
DVIA-M1000
230328R3
Sigma 300
Shanghai
Related Case Studies

DVIA-M Series
Dow Chemical Sigma 300 DVIA-M1000 (230420R3) Installation Report
10-31-2023Read more

DVIA-M Series
Shanghai Jiao Tong University Hitachi SU8600 FE-SEM DVIA-M1000 (250320R3) Installation Report
04-13-2026Read more

DVIA-M Series
YIMO Shanghai Pumi PrMat STM DVIA-M1000 (241101R2) Installation Report — Huasheng Lianying Vibration Damping Platform
01-23-2026Read more