Dow Chemical Sigma 300 DVIA-M1000 (230328R3) Installation Report

DVIA-M Series
Installation Report
Dow Chemical
DVIA-M1000
230328R3
Sigma 300
Shanghai

Dow Chemical

Dow Chemical

(M1000_ 230328R3 Set up)

Site checklist

Target equipmentSigma 300
Place of installationShanghai
RemarkGood Performance
END USERDow Chemical

Operator and dates

Operator: Lee, Sangjae

Date of setup: 23.10.31

Date of reporting: 23.10.31

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.10.31 (Tuesday)

Operator: DAEIL SYSTEMS Sangjae Lee

Place of measurement: Shanghai

Equipment Model: Sigma 300

5.

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date10-31-2023
Tags
DVIA-M Series
Installation Report
Dow Chemical
DVIA-M1000
230328R3
Sigma 300
Shanghai