Skip to main content
Installation Report
DVIA-M Series
10-04-2023

ZEISS sigma300 SEM DVIA-M1000 Internal Program Performance Report — Trina Solar (Changzhou, 2023)

DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
sigma300
SEM
Trina Solar
Changzhou

(M1000_ 230602R3 Set up)

Equipment installation

Target equipmentsigma300
Place of installationChangzhou
RemarkGood Performance
END USERTrina Solar

Operator: Lee, Youngha

Date of setup: 23.09.27

Date of reporting: 23.10.04

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.09.27 (Wednesday)

Operator: DAEIL SYSTEMS Youngha Lee

Place of measurement: Changzhou

Equipment Model: sigma300

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date10-04-2023
Tags
DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
sigma300
SEM
Trina Solar
Changzhou