Installation Report
DVIA-M Series
09-19-2023
Crossbeam550 DVIA-M1000 (230522R2) Set up — Shenzhen
DVIA-M Series
Installation Report
Crossbeam550
DVIA-M1000
230522R2
Shenzhen
PXW
Contents
Target equipment
Crossbeam550
Place of installation
Shenzhen
Remark
Good Performance
END USER
PXW
Operator
Yu, Hosang
Date of setup
23.09.08
Date of reporting
23.09.19
Date of business trip
17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2023.09.08 (Friday)
Measurement operator
DAEIL SYSTEMS Hosang Yu
Place of measurement
Shenzhen
Equipment model
Crossbeam550
5. M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-19-2023
Tags
DVIA-M Series
Installation Report
Crossbeam550
DVIA-M1000
230522R2
Shenzhen
PXW


