Skip to main content
Installation Report
DVIA-M Series
09-19-2023

Crossbeam550 DVIA-M1000 (230522R2) Set up — Shenzhen

DVIA-M Series
Installation Report
Crossbeam550
DVIA-M1000
230522R2
Shenzhen
PXW

Target equipment

Crossbeam550

Place of installation

Shenzhen

Remark

Good Performance

END USER

PXW

Operator

Yu, Hosang

Date of setup

23.09.08

Date of reporting

23.09.19

Date of business trip

17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2023.09.08 (Friday)

Measurement operator

DAEIL SYSTEMS Hosang Yu

Place of measurement

Shenzhen

Equipment model

Crossbeam550

5. M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date09-19-2023
Tags
DVIA-M Series
Installation Report
Crossbeam550
DVIA-M1000
230522R2
Shenzhen
PXW