Installation Report
DVIA-M Series
09-19-2023
PXW Crossbeam550 DVIA-M1000 (230222R2) Shenzhen setup note
DVIA-M Series
Installation Report
PXW
Shenzhen
Crossbeam550
DVIA-M1000
230222R2
Contents
PXW
PXW
(M1000_ 230222R2 Set up)
Site checklist
| Target equipment | Crossbeam550 |
|---|---|
| Place of installation | Shenzhen |
| Remark | Good Performance |
| END USER | PXW |
Operator and dates
Operator: Park, Jongwon
Date of setup: 23.09.07
Date of reporting: 23.09.19
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.09.07 (Thursday)
Operator: DAEIL SYSTEMS Jongwon Park
Place of measurement: Shenzhen
Equipment Model: Crossbeam550
5.
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-19-2023
Tags
DVIA-M Series
Installation Report
PXW
Shenzhen
Crossbeam550
DVIA-M1000
230222R2