Skip to main content
Installation Report
DVIA-M Series
09-19-2023

PXW Crossbeam550 DVIA-M1000 (230222R2) Shenzhen setup note

DVIA-M Series
Installation Report
PXW
Shenzhen
Crossbeam550
DVIA-M1000
230222R2

PXW

PXW

(M1000_ 230222R2 Set up)

Site checklist

Target equipmentCrossbeam550
Place of installationShenzhen
RemarkGood Performance
END USERPXW

Operator and dates

Operator: Park, Jongwon

Date of setup: 23.09.07

Date of reporting: 23.09.19

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.09.07 (Thursday)

Operator: DAEIL SYSTEMS Jongwon Park

Place of measurement: Shenzhen

Equipment Model: Crossbeam550

5.

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date09-19-2023
Tags
DVIA-M Series
Installation Report
PXW
Shenzhen
Crossbeam550
DVIA-M1000
230222R2