Installation Report
09-19-2023

Crossbeam550 DVIA-M1000 (230222R2) Shenzhen setup note

DVIA-M Series
Installation Report
Shenzhen
Crossbeam550
DVIA-M1000
230222R2

Site checklist

Target equipmentCrossbeam550
Place of installationShenzhen
RemarkGood Performance
END USERN/A

Operator and dates

Operator: Park, Jongwon

Date of setup: 23.09.07

Date of reporting: 23.09.19

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.09.07 (Thursday)

Operator: DAEIL SYSTEMS Jongwon Park

Place of measurement: Shenzhen

Equipment Model: Crossbeam550

5.

M1000 internal program performance measurement result

Z axis

X axis

Y axis