HUAI HONG DA Sigma 300 DVIA-M1000 (230417R8) Installation Report
DVIA-M Series
Installation Report
HUAI HONG DA
DVIA-M1000
230417R8
Sigma 300
Changzhou
Contents
HUAI HONG DA
HUAI HONG DA
(M1000_ 230417R8 Set up)
Site checklist
| Target equipment | Sigma 300 |
|---|---|
| Place of installation | CHANGZHOU |
| Remark | Good Performance |
| END USER | HUAI HONG DA |
Operator and dates
Operator: Lee, Young Ha
Date of setup: 23.06.06
Date of reporting: 23.06.13
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.06.06 (Tuesday)
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: CHANGZHOU
Equipment Model: HUAI HONG DA
5.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date06-13-2023
Tags
DVIA-M Series
Installation Report
HUAI HONG DA
DVIA-M1000
230417R8
Sigma 300
Changzhou
Related Case Studies

DVIA-M Series
YIMO ZEISS FE-SEM Sigma 300 DVIA-M1000 (250131R1) Installation Report
02-20-2025Read more

DVIA-M Series
CNITECH ZEISS FE-SEM Sigma 300 DVIA-M1000 (230908R2-2) Installation Report
01-16-2024Read more

DVIA-M Series
Dow Chemical Sigma 300 DVIA-M1000 (230328R3) Installation Report
10-31-2023Read more