Installation Report
DVIA-M Series
05-22-2023
Vanchip Gemini560 DVIA-M1000 (230403R2) Installation Report
DVIA-M Series
Installation Report
Vanchip
Gemini560
DVIA-M1000
230403R2
Shanghai
Contents
Reporting cover
Vanchip
(M1000_ 230403R2 Set up)
Target equipment
Gemini560
Place of installation
Shanghai
Remark
Good Performance
END USER
Vanchip
Operator
Lee, Sang Jae
Date of setup
23.05.09
Date of reporting
23.05.22
Date of business trip
17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2023.05.09 (Tuesday)
Measurement operator
Operator: DAEIL SYSTEMS, Sangjae Lee
Place of measurement
Place of measurement: Shanghai
Equipment Model
Equipment Model: Gemini560
Section marker
5.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-22-2023
Tags
DVIA-M Series
Installation Report
Vanchip
Gemini560
DVIA-M1000
230403R2
Shanghai
Related Case Studies

DVIA-M Series
Shanghai Jiao Tong University Hitachi SU8600 FE-SEM DVIA-M1000 (250320R3) Installation Report
04-13-2026Read more

DVIA-M Series
YIMO Shanghai Pumi PrMat STM DVIA-M1000 (241101R2) Installation Report — Huasheng Lianying Vibration Damping Platform
01-23-2026Read more

DVIA-M Series
Tongji University Raith Voyager MAX EBL DVIA-M1000 (250402R6) Installation Report
08-07-2025Read more