Skip to main content
Installation Report
DVIA-M Series
05-15-2026

DVIA-M1000 (230324R6) Set-up Report

DVIA-M Series
Installation Report
DVIA-M1000
230324R6
Set-up

M1000 _ 230324R6 Set-up

FieldValue
Target equipmentN/A
Place of installation-
RemarkGood Performance
END USER-

Operator: Chaewon Lee

Date of setup: 24.03.12

Date of reporting: 24.07.05

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2024.03.12(Sunday)

Operator: Chaewon Lee from DAEIL SYSTEMS

Place of measurement: N/A

Equipment Model: 5.

M1000 internal program performance measurement result

Vertical

Left to Right

Front to Back