Installation Report
DVIA-M Series
05-15-2026
DVIA-M1000 (230324R6) Set-up Report
DVIA-M Series
Installation Report
DVIA-M1000
230324R6
Set-up
Contents
M1000 _ 230324R6 Set-up
| Field | Value |
|---|---|
| Target equipment | N/A |
| Place of installation | - |
| Remark | Good Performance |
| END USER | - |
Operator: Chaewon Lee
Date of setup: 24.03.12
Date of reporting: 24.07.05
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2024.03.12(Sunday)
Operator: Chaewon Lee from DAEIL SYSTEMS
Place of measurement: N/A
Equipment Model: 5.
M1000 internal program performance measurement result
Vertical
Left to Right
Front to Back
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-15-2026
Tags
DVIA-M Series
Installation Report
DVIA-M1000
230324R6
Set-up
Related Case Studies

DVIA-M Series
RIGOL TECHNOLOGIES Sigma300 DVIA-M1000 (220907R4-1) Installation Report
05-16-2026Read more

DVIA-M Series
PXW ZEISS FIB-SEM Crossbeam550 DVIA-M1000 (230222R4) Installation Report
05-15-2026Read more

DVIA-M Series
Chinese Academy of Sciences — Institute of Metal Research ZEISS GeminiSEM360 DVIA-M1000 (230328R2) Installation Report
05-15-2026Read more