Installation Report
DVIA-M Series
05-16-2026
RIGOL TECHNOLOGIES Sigma300 DVIA-M1000 (220907R4-1) Installation Report
DVIA-M Series
Installation Report
RIGOL TECHNOLOGIES
Sigma300
DVIA-M1000
220907R4-1
Contents
Equipment installation photograph
| Target equipment | Sigma300 |
|---|---|
| Place of installation | Suzhou |
| Remark | Good Performance |
| END USER | RIGOL TECHNOLOGIES, Co. LTD |
Operator: Lee, Young Ha
Date of setup: 22.10.11
Date of reporting: 22.10.12
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
Measurement date: 2022.10.11 (Thursday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: Suzhou
Equipment Model: Sigma300
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-16-2026
Tags
DVIA-M Series
Installation Report
RIGOL TECHNOLOGIES
Sigma300
DVIA-M1000
220907R4-1
Related Case Studies

DVIA-M Series
Guangzhou Kingmed Sigma300 DVIA-M1000 (230401R1) Installation Report
05-15-2026Read more

DVIA-M Series
Shanghai Institute of Space Propulsion ZEISS Sigma300 DVIA-M1000 (230701R3) Installation Report
05-15-2026Read more

DVIA-M Series
Xi'an Jiaotong University ZEISS Sigma300 SEM DVIA-M1000 (231009R3) Installation Report
12-04-2024Read more