Skip to main content
Installation Report
DVIA-M Series
02-15-2023

LyondellBasell ZEISS EVO10 DVIA-M1000 (221221R2) Installation Report

DVIA-M Series
Installation Report
LyondellBasell
ZEISS
EVO10
DVIA-M1000
221221R2
Suzhou

(M1000_ 221221R2 Set up)

Site checklist

Target equipmentZeiss EVO10
Place of installationSUZHOU
RemarkGood Performance
END USERLyondellbasell

Operator and dates

Operator: Lee, Young Ha

Date of setup: 23.02.15

Date of reporting: 23.02.17

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.02.15 (Wednesday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: SUZHOU

Equipment Model: Zeiss EVO10

5.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date02-15-2023
Tags
DVIA-M Series
Installation Report
LyondellBasell
ZEISS
EVO10
DVIA-M1000
221221R2
Suzhou