GEM CO.,Ltd Apreo 2C DVIA-M1000 (220907R2) Installation Report
DVIA-M Series
Installation Report
GEM CO.,Ltd
DVIA-M1000
220907R2
Apreo 2C
Thermo Fisher Scientific
HUBEI
Contents
GEM CO.,Ltd
GEM CO.,Ltd
A
(M1000_ 220907R2 Set up)
Site checklist
| Target equipment | Apreo 2C |
|---|---|
| Place of installation | HUBEI |
| Remark | Good Performance |
| END USER | GEM CO.,Ltd |
Operator and dates
Operator: Lee, Young Ha
Date of setup: 22.12.13
Date of reporting: 23.01.12
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.12.13 (Tuesday),
Operator: DAEIL SYSTEMS, Youngha Lee
Place of measurement: HUBEI
Equipment Model: Apreo 2C
5.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date01-12-2023
Tags
DVIA-M Series
Installation Report
GEM CO.,Ltd
DVIA-M1000
220907R2
Apreo 2C
Thermo Fisher Scientific
HUBEI
Related Case Studies

DVIA-M Series
Thermo Scientific Apreo 2C SEM DVIA-M1000 (221206R2) Set Up Report
02-06-2023Read more

DVIA-M Series
YIMO Thermo Fisher Scientific SEM Apreo 2S DVIA-M1000 (240930R6) Installation Report
03-31-2025Read more

DVIA-M Series
YIMO Thermo Fisher Scientific SEM Apreo 2S DVIA-M1000 (240930R6) Installation Report
03-25-2025Read more