Skip to main content
Installation Report
DVIA-M Series
01-12-2023

GEM CO.,Ltd Apreo 2C DVIA-M1000 (220907R2) Installation Report

DVIA-M Series
Installation Report
GEM CO.,Ltd
DVIA-M1000
220907R2
Apreo 2C
Thermo Fisher Scientific
HUBEI

GEM CO.,Ltd

GEM CO.,Ltd

A

(M1000_ 220907R2 Set up)

Site checklist

Target equipmentApreo 2C
Place of installationHUBEI
RemarkGood Performance
END USERGEM CO.,Ltd

Operator and dates

Operator: Lee, Young Ha

Date of setup: 22.12.13

Date of reporting: 23.01.12

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.12.13 (Tuesday),

Operator: DAEIL SYSTEMS, Youngha Lee

Place of measurement: HUBEI

Equipment Model: Apreo 2C

5.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date01-12-2023
Tags
DVIA-M Series
Installation Report
GEM CO.,Ltd
DVIA-M1000
220907R2
Apreo 2C
Thermo Fisher Scientific
HUBEI