Installation Report
DVIA-M Series
02-06-2023

Thermo Scientific Apreo 2C SEM DVIA-M1000 (221206R2) Set Up Report

DVIA-M Series
Installation Report
PYLON BATTERY
Thermo Fisher Scientific
Apreo 2C
SEM
DVIA-M1000
221206R2
Jiangsu

Target equipment

Thermoscientific Apreo 2C

Place of installation

JIANGSU

Remark

Good Performance

END USER

PYLON BATTERY

Operator

Yu, Ho Sang

Date of setup

23.02.03

Date of reporting

23.02.06

Date of business trip

17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date

2023.02.03 (Friday)

Operator: DAEIL SYSTEMS, Hosang Yu

Place of measurement

JIANGSU

Equipment Model

Thermoscientific Apreo 2C

M1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date02-06-2023
Tags
DVIA-M Series
Installation Report
PYLON BATTERY
Thermo Fisher Scientific
Apreo 2C
SEM
DVIA-M1000
221206R2
Jiangsu