Installation Report
DVIA-M Series
02-06-2023
Thermo Scientific Apreo 2C SEM DVIA-M1000 (221206R2) Set Up Report
DVIA-M Series
Installation Report
PYLON BATTERY
Thermo Fisher Scientific
Apreo 2C
SEM
DVIA-M1000
221206R2
Jiangsu
Contents
Target equipment
Thermoscientific Apreo 2C
Place of installation
JIANGSU
Remark
Good Performance
END USER
PYLON BATTERY
Operator
Yu, Ho Sang
Date of setup
23.02.03
Date of reporting
23.02.06
Date of business trip
17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date
2023.02.03 (Friday)
Operator: DAEIL SYSTEMS, Hosang Yu
Place of measurement
JIANGSU
Equipment Model
Thermoscientific Apreo 2C
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date02-06-2023
Tags
DVIA-M Series
Installation Report
PYLON BATTERY
Thermo Fisher Scientific
Apreo 2C
SEM
DVIA-M1000
221206R2
Jiangsu
Related Case Studies

DVIA-M Series
YIMO Thermo Fisher Scientific SEM Apreo 2S DVIA-M1000 (240930R6) Installation Report
03-31-2025Read more

DVIA-M Series
YIMO Thermo Fisher Scientific SEM Apreo 2S DVIA-M1000 (240930R6) Installation Report
03-25-2025Read more

DVIA-M Series
GEM CO.,Ltd Apreo 2C DVIA-M1000 (220907R2) Installation Report
01-12-2023Read more