Installation Report
DVIA-M Series
06-12-2023
Anhui GOLD STAR Titanium Dioxide Apreo 2S HiVac DVIA-M1000 (220718R5) Installation Report
DVIA-M Series
Installation Report
Anhui GOLD STAR
DVIA-M1000
220718R5
Apreo 2S HiVac
ANHUI
Contents
Anhui GOLD STAR Titanium DIOXIDE(Group) Co., Ltd.
Anhui GOLD STAR Titanium DIOXIDE(Group) Co., Ltd.
(M1000_ 220718R5 Set up)
Site checklist
| Target equipment | Apreo 2S HiVac |
|---|---|
| Place of installation | ANHUI |
| Remark | Good Performance |
| END USER | Anhui GOLD STAR Titanium DIOXIDE(Group) Co., Ltd. |
Operator and dates
Operator: Yu, Ho Sang
Date of setup: 23.05.30
Date of reporting: 23.06.12
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2023.05.30 (Tuesday)
Operator: DAEIL SYSTEMS, Hosang Yu
Place of measurement: ANHUI
Equipment Model: Apreo 2S HiVac
5.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date06-12-2023
Tags
DVIA-M Series
Installation Report
Anhui GOLD STAR
DVIA-M1000
220718R5
Apreo 2S HiVac
ANHUI
Related Case Studies

DVIA-M Series
Apreo 2S HiVac DVIA-M1000 (230421R2) Installation Report — Ningbo Ronbay
07-13-2023Read more

DVIA-M Series
RIGOL TECHNOLOGIES Sigma300 DVIA-M1000 (220907R4-1) Installation Report
05-16-2026Read more

DVIA-M Series
PXW ZEISS FIB-SEM Crossbeam550 DVIA-M1000 (230222R4) Installation Report
05-15-2026Read more