Skip to main content
Installation Report
DVIA-M Series
06-12-2023

Anhui GOLD STAR Titanium Dioxide Apreo 2S HiVac DVIA-M1000 (220718R5) Installation Report

DVIA-M Series
Installation Report
Anhui GOLD STAR
DVIA-M1000
220718R5
Apreo 2S HiVac
ANHUI

Anhui GOLD STAR Titanium DIOXIDE(Group) Co., Ltd.

Anhui GOLD STAR Titanium DIOXIDE(Group) Co., Ltd.

(M1000_ 220718R5 Set up)

Site checklist

Target equipmentApreo 2S HiVac
Place of installationANHUI
RemarkGood Performance
END USERAnhui GOLD STAR Titanium DIOXIDE(Group) Co., Ltd.

Operator and dates

Operator: Yu, Ho Sang

Date of setup: 23.05.30

Date of reporting: 23.06.12

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2023.05.30 (Tuesday)

Operator: DAEIL SYSTEMS, Hosang Yu

Place of measurement: ANHUI

Equipment Model: Apreo 2S HiVac

5.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date06-12-2023
Tags
DVIA-M Series
Installation Report
Anhui GOLD STAR
DVIA-M1000
220718R5
Apreo 2S HiVac
ANHUI