Installation Report
DVIA-M Series
07-13-2023
Apreo 2S HiVac DVIA-M1000 (230421R2) Installation Report — Ningbo Ronbay
DVIA-M Series
Installation Report
Thermo Fisher Scientific
Apreo 2S HiVac
DVIA-M1000
230421R2
Ningbo
Ronbay
Contents
Customer
Ningbo Ronbay New Energy Technology Co., Ltd.
(M1000_ 230421R2 Set up)
| Field | Value |
|---|---|
| Target equipment | Apreo 2S HiVac |
| Place of installation | Ningbo |
| Remark | Good Performance |
| END USER | Ningbo Ronbay New Energy Technology Co., Ltd. |
| Operator: Lee, Sang Jae Date of setup: 23.07.07 Date of reporting: 23.07.13 | Date of business trip : 17.12.27~17.12.29 |
| Overview The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended. Measurement date: 2023.07.07 (Friday) Operator: DAEIL SYSTEMS, Sangjae Lee Place of measurement: Ningbo Equipment Model: Apreo 2S HiVac | 5. |
M1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-13-2023
Tags
DVIA-M Series
Installation Report
Thermo Fisher Scientific
Apreo 2S HiVac
DVIA-M1000
230421R2
Ningbo
Ronbay
Related Case Studies

DVIA-M Series
TESCAN SEM MAGNA DVIA-M1000 (230908R2-1) Installation Report
05-15-2026Read more

DVIA-M Series
Peking University Shenzhen Graduate School Thermo Fisher Helios 5 CX FIB-SEM DVIA-M1000 (250613R3) Installation Report
11-11-2025Read more
DVIA-M Series
Chinese Academy of Sciences Institute of Semiconductors Thermo Fisher Helios 5 CX DVIA-M1000 (250619R4) Installation Report
09-01-2025Read more