Skip to main content
Installation Report
DVIA-M Series
09-19-2022

Jiangsu Modern Road & Bridge Axia ChemiSEM HiVac DVIA-M1000 (220718R3) Installation Report — Nanjing

DVIA-M Series
Installation Report
Jiangsu Modern Road & Bridge
Thermo Scientific
Axia
ChemiSEM
Nanjing
DVIA-M1000
220718R3

Customer and setup title

Jiangsu Modern Road&Bridge Co., Ltd.

(江苏现代路桥有限责任公司)

(M1000_ 220718R3 Set up)

Target equipment and site

Target equipmentAxia ChemiSEM HiVac
Place of installationNanjing
RemarkGood Performance
END USERJiangsu Modern Road&Bridge Co., Ltd(江苏现代路桥有限责任公司)

Reporting schedule

Operator: Yu, Ho Sang

Date of setup: 22.09.19

Date of reporting: 22.09.20

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.09.19 (Monday),

Operator: DAEIL SYSTEMS, Hosang Yu

Place of measurement: Nanjing

Equipment Model: Axia ChemiSEM HiVac

Measurement conditions and results

Summary of measurement results

Test Condition

VC-Class

ZXY
FloorCDD
Above ActiveDEF

Good omnidirectional performance.

MB1000 internal program performance measurement result

MB1000 internal program — Z axis

MB1000 internal program — X axis

MB1000 internal program — Y axis

Octave Band Result

Octave Band Result — Z axis

Octave Band Result — X axis

Octave Band Result — Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date09-19-2022
Tags
DVIA-M Series
Installation Report
Jiangsu Modern Road & Bridge
Thermo Scientific
Axia
ChemiSEM
Nanjing
DVIA-M1000
220718R3