Installation Report
DVIA-M Series
05-27-2022
Wenzhou Hongfeng ZEISS Sigma 300 Haimen DVIA-M1000 Installation Report (220216R1, 2022-05-27)
DVIA-M Series
Installation Report
Wenzhou Hongfeng
Haimen
DVIA-M1000
ZEISS Sigma 300
220216R1
Sigma 300
Contents
Wenzhou Hongfeng Electrical Alloy Co., Ltd.
(M1000_ 220216R1 Set up)
Site checklist
| Target equipment | ZEISS Sigma300 |
|---|---|
| Place of installation | Haimen |
| Remark | Good Performance |
| END USER | General Lithium Corporation |
Operator and dates
Operator: Cheon, Seoung hoon
Date of setup: 22.05.27
Date of reporting: 22.05.27
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.05.27 (Friday),
Operator: DAEIL SYSTEMS, Seounghoon Cheon
Place of measurement: Haimen
Equipment Model: ZEISS Sigma300
Measurement conditions and results
Summary of measurement results
| Z | X | Y | |
|---|---|---|---|
| Floor | B | C | D |
| Above Active | F | F | F |
Good omnidirectional performance.
MB1000 internal program performance measurement result
MB1000 internal program — Z axis
MB1000 internal program — X axis
MB1000 internal program — Y axis
Octave Band Result
Octave Band Result — Z axis
Octave Band Result — X axis
Octave Band Result — Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-27-2022
Tags
DVIA-M Series
Installation Report
Wenzhou Hongfeng
Haimen
DVIA-M1000
ZEISS Sigma 300
220216R1
Sigma 300


