Installation Report
DVIA-M Series
05-19-2022
ZEISS Gemini Crossbeam 350 DVIA-M1000 Installation Report (JuCan Optoelectronics, Suqian, 220106R5, 2022)
DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
Gemini Crossbeam 350
JuCan Optoelectronics
Suqian
220106R5
Set-up photograph
Target equipment
ZEISS Gemini Crossbeam 350
Place of installation
SUQIAN, 1F
Remark
Good Performance
END USER
JuCan Optoelectronics(聚灿光电)
Operator: Cheon, Seoung Hoon
Date of setup : 22.05.16
Date of reporting : 22.05.19
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.05.16 (Monday),
Operator: Daeil System, SeoungHoon Cheon
Place of measurement: SUQIAN, 1F
Equipment Model: ZEISS Gemini Crossbeam 350
Measurement conditions and results
Summary of measurement results
Test Condition
VC-Class
| Z | X | Y | |||
|---|---|---|---|---|---|
| Floor | B | D | D | ||
| Above Active | F | D | D | ||
Good omnidirectional performance.
MB1000 internal program performance measurement result
Internal Program — Z Axis
Internal Program — X Axis
Internal Program — Y Axis
Octave Band Result
Octave Band — Z Axis
Octave Band — X Axis
Octave Band — Y Axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date05-19-2022
Tags
DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
Gemini Crossbeam 350
JuCan Optoelectronics
Suqian
220106R5
Related Case Studies

DVIA-M Series
PXW ZEISS FIB-SEM Crossbeam550 DVIA-M1000 (230222R4) Installation Report
05-15-2026Read more

DVIA-M Series
Chinese Academy of Sciences — Institute of Metal Research ZEISS GeminiSEM360 DVIA-M1000 (230328R2) Installation Report
05-15-2026Read more

DVIA-M Series
PXW ZEISS GeminiSEM560 DVIA-M1000 (230525R8) Installation Report
05-15-2026Read more