ZEISS Gemini Crossbeam 350 DVIA-M1000 Installation Report (JuCan Optoelectronics, Suqian, 220106R5, 2022)

DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
Gemini Crossbeam 350
JuCan Optoelectronics
Suqian
220106R5

Set-up photograph

Target equipment

ZEISS Gemini Crossbeam 350

Place of installation

SUQIAN, 1F

Remark

Good Performance

END USER

JuCan Optoelectronics(聚灿光电)

Operator: Cheon, Seoung Hoon

Date of setup : 22.05.16

Date of reporting : 22.05.19

Date of business trip : 17.12.27~17.12.29

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.05.16 (Monday),

Operator: Daeil System, SeoungHoon Cheon

Place of measurement: SUQIAN, 1F

Equipment Model: ZEISS Gemini Crossbeam 350

Measurement conditions and results

Summary of measurement results

Test Condition

VC-Class

ZXY
FloorBDD
Above ActiveFDD

Good omnidirectional performance.

MB1000 internal program performance measurement result

Internal Program — Z Axis

Internal Program — X Axis

Internal Program — Y Axis

Octave Band Result

Octave Band — Z Axis

Octave Band — X Axis

Octave Band — Y Axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date05-19-2022
Tags
DVIA-M Series
Installation Report
DVIA-M1000
ZEISS
Gemini Crossbeam 350
JuCan Optoelectronics
Suqian
220106R5