Installation Report
DVIA-M Series
06-22-2022
Northwestern Polytechnical University Zeiss G450 DVIA-M1000 (210923R5) Internal Program — Xi’an, 2022.06.22
DVIA-M Series
Installation Report
Northwestern Polytechnical University
Zeiss G450
Xi'an
China
DVIA-M1000
210923R5
Contents
(M1000_ 210923R5 Set up)
Equipment installation
| Target equipment | Zeiss G450 |
|---|---|
| Place of installation | Xi'an, China |
| Remark | Good Performance |
| END USER | Northwestern Polytechnical University |
| Operator: Yu, Ho Sang Date of setup: 22.06.22Date of reporting: 22.06.22 | Date of business trip : 17.12.27~17.12.29 |
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.06.22 (Wednesday),
Operator: DAEIL SYSTEMS, Hosang Yu
Place of measurement: Xi'an, China
Equipment Model: Zeiss G450
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date06-22-2022
Tags
DVIA-M Series
Installation Report
Northwestern Polytechnical University
Zeiss G450
Xi'an
China
DVIA-M1000
210923R5
Related Case Studies

DVIA-M Series
Xi'an Jiaotong University ZEISS Sigma 300 DVIA-M1000 (231009R3) Installation Report
07-05-2024Read more

DVIA-M Series
Hubei Youxing New Energy Sigma 300 DVIA-M1000 (230703R1) Installation Report
10-17-2023Read more

DVIA-M Series
Sigma500 DVIA-M1000 Installation Report (Hubei Xingyou, 221118R1)
07-07-2023Read more