Installation Report
DVIA-M Series
07-27-2022
Ningbo Institute of materials ZEISS Gemini 300 DVIA-M1000 (210714R2-2) Internal Program Performance — Binzhou — 2022.07.27
DVIA-M Series
Installation Report
Ningbo Institute of materials
ZEISS
Gemini 300
BINZHOU
DVIA-M1000
210714R2-2
Contents
Ningbo Institute of materials(宁波材料所)
(M1000_ 210714R2-2 Set up)
Equipment installation
| Target equipment | ZEISS GEMINI300 |
|---|---|
| Place of installation | BINZHOU |
| Remark | Good Performance |
| END USER | Ningbo Institute of materials(宁波材料所) |
| Operator: Lee, Young ha | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 22.07.27 | |
| Date of reporting: 22.07.27 |
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.07.27 (Wednesday),
Operator: DAEIL SYSTEMS, Hosang Yu, Youngha Lee
Place of measurement: BINZHOU
Equipment Model: ZEISS GEMINI300
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-27-2022
Tags
DVIA-M Series
Installation Report
Ningbo Institute of materials
ZEISS
Gemini 300
BINZHOU
DVIA-M1000
210714R2-2
Related Case Studies

DVIA-M Series
Ningbo Institute of materials ZEISS GEMINI300 DVIA-M1000 (210714R2-2) Installation Report — 2022.08.05
08-05-2022Read more

DVIA-M Series
PXW ZEISS FIB-SEM Crossbeam550 DVIA-M1000 (230222R4) Installation Report
05-15-2026Read more

DVIA-M Series
Chinese Academy of Sciences — Institute of Metal Research ZEISS GeminiSEM360 DVIA-M1000 (230328R2) Installation Report
05-15-2026Read more