(M1000_210701R6 Re-tuning)

Target equipment and site

Target equipmentTHERMO APREO 2S
Place of installationGUANGZHOU, 1F
RemarkGood Performance
END USEROpton

Report details

Operator: Yu, Ho Sang<br>Date of setup : 22.05.18<br>Date of reporting : 22.05.19Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.05.18 (Wednesday),
Operator: Daeil System, HoSang Yu
Place of measurement: GUANGZHOU, 1F
Equipment Model: THERMO APREO 2S

Measurement conditions and results

Summary of measurement results

Test ConditionTransmissibility
2 Hz5 Hz10 Hz
Z-24.13 dB-21.34 dB-26.32 dB
X-21.09 dB-21.30 dB-25.45 dB
Y-21.58 dB-20.90 dB-25.57 dB

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date05-19-2022
Tags
DVIA-M Series
Installation Report
Opton
Guangzhou
THERMO APREO 2S
DVIA-M1000
210701R6