Skip to main content
Installation Report
DVIA-M Series
09-05-2022

Guangdong Technion-Israel Institute of Technology Raith Pioneer two EBL DVIA-M1000 (210423R1) — 2022.09.05

DVIA-M Series
Installation Report
Guangdong Technion-Israel Institute of Technology
Raith Pioneer two EBL
Shantou
DVIA-M1000
210423R1

(M1000_ 210423R1 Set up)

Installation site

Target equipmentRaith Pioneer two EBL
Place of installationShantou
RemarkGood Performance
END USERGuangdong Technion-Israel Institute of Technology
Operator: Yu, Ho SangDate of business trip : 17.12.27~17.12.29
Date of setup: 22.09.05
Date of reporting: 22.09.13

Overview

The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.

Measurement date: 2022.09.05 (Monday),

Operator: DAEIL SYSTEMS, Hosang Yu

Place of measurement: Shantou

Equipment Model: Raith Pioneer two EBL

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date09-05-2022
Tags
DVIA-M Series
Installation Report
Guangdong Technion-Israel Institute of Technology
Raith Pioneer two EBL
Shantou
DVIA-M1000
210423R1