Installation Report
DVIA-M Series
09-05-2022
Guangdong Technion-Israel Institute of Technology Raith Pioneer two EBL DVIA-M1000 (210423R1) — 2022.09.05
DVIA-M Series
Installation Report
Guangdong Technion-Israel Institute of Technology
Raith Pioneer two EBL
Shantou
DVIA-M1000
210423R1
Contents
(M1000_ 210423R1 Set up)
Installation site
| Target equipment | Raith Pioneer two EBL |
|---|---|
| Place of installation | Shantou |
| Remark | Good Performance |
| END USER | Guangdong Technion-Israel Institute of Technology |
| Operator: Yu, Ho Sang | Date of business trip : 17.12.27~17.12.29 |
| Date of setup: 22.09.05 | |
| Date of reporting: 22.09.13 |
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.09.05 (Monday),
Operator: DAEIL SYSTEMS, Hosang Yu
Place of measurement: Shantou
Equipment Model: Raith Pioneer two EBL
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-05-2022
Tags
DVIA-M Series
Installation Report
Guangdong Technion-Israel Institute of Technology
Raith Pioneer two EBL
Shantou
DVIA-M1000
210423R1


