Installation Report
DVIA-M Series
01-29-2021
HITACHI Regulus 8230 DVIA-MB1000 Program (P173 / 191219R3-4) Installation Report — 2021.01.29
DVIA-M Series
Installation Report
HITACHI
Regulus 8230
DVIA-MB1000
MB1000
P173
191219R3-4
Contents
(MB1000_P173 191219R3-4)
| Target equipment | HITACHI-Regulus 8230 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 21.01.26 | |
| Date of reporting : 21.01.29 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date
Measurement date: 21.01.26 (Tue)
Operator
Operator: Daeil System, Research engineer Choi, HyoungMun
Place of measurement
N/A
Equipment Model
Equipment Model: HITACHI-Regulus 8230
Measurement conditions and results
N/A
Summary of measurement results
Test Condition
Transmissibility
| 2 Hz | 5 Hz | 10 Hz | |
|---|---|---|---|
| Z | -26 dB | -28 dB | -30 dB |
| X | -26 dB | -33 dB | -30 dB |
| Y | -25 dB | -38 dB | -37 dB |
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date01-29-2021
Tags
DVIA-M Series
Installation Report
HITACHI
Regulus 8230
DVIA-MB1000
MB1000
P173
191219R3-4
Related Case Studies

DVIA-M Series
Hitachi HT7800 DVIA-MB1000 (P173 / 191219R3-4, Nimo remote tuning) — 2020.09.03
09-03-2020Read more

DVIA-M Series
HITACHI DVIA-MB1000 (P177 / 200522R2-6) Internal Program Performance — 2020.08.11
08-11-2020Read more

DVIA-M Series
Zhejiang University HITACHI H-7650 TEM DVIA-MB1000 (MB1000 P70) Installation Report — 2018-09-17
09-17-2018Read more