Installation Report
DVIA-M Series
07-26-2022
Chinese Academy of Forestry Hitachi SU8230 Nanjing DVIA-M1000 Installation Report (210111R3, 2022-07-26)
DVIA-M Series
Installation Report
Chinese Academy of Forestry
Nanjing
DVIA-M1000
Hitachi
SU8230
210111R3
SEM
Contents
Chinese Academy of Forestry
Chinese Academy of Forestry
(中国林业科学研究院)
(M1000_ 210111R3 Set up)
Site checklist
| Target equipment | Hitachi SU8230 |
|---|---|
| Place of installation | NANJING |
| Remark | Good Performance |
| END USER | Chinese Academy of Forestry |
Operator and dates
Operator: Cheon, Seoung hoon
Date of setup: 22.07.25
Date of reporting: 22.07.26
Date of business trip : 17.12.27~17.12.29
Overview
The DVIA-M1000 active vibration isolation platform is appropriately installed and functioning as intended.
Measurement date: 2022.07.25 (Monday),
Operator: DAEIL SYSTEMS, Seounghoon Cheon, Youngha Lee
Place of measurement: NANJING
Equipment Model: Hitachi SU8230
Measurement conditions and results
Summary of measurement results
| Z | X | Y | |
|---|---|---|---|
| Floor | B | D | C |
| Above Active | E | F | G |
Good omnidirectional performance.
MB1000 internal program performance measurement result
MB1000 internal program — Z axis
MB1000 internal program — X axis
MB1000 internal program — Y axis
Octave Band Result
Octave Band Result — Z axis
Octave Band Result — X axis
Octave Band Result — Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-26-2022
Tags
DVIA-M Series
Installation Report
Chinese Academy of Forestry
Nanjing
DVIA-M1000
Hitachi
SU8230
210111R3
SEM
Related Case Studies

DVIA-M Series
Hitachi SEM SU8230 DVIA-M1000 (250421R6) Installation Report
03-26-2026Read more

DVIA-M Series
Hitachi SU8010 (Sun Yat-sen University) DVIA-M1000 Installation Report
04-19-2023Read more

DVIA-M Series
Hitachi SU8600 SEM DVIA-M1000 Internal Program Performance Report — ZEEKR (Shenzhen, 2022)
11-29-2022Read more