Installation Report
DVIA-M Series
07-29-2020
Ziess-Gemini 2 DVIA-MB1000 (P172) Internal program performance — 2020.07.29
DVIA-M Series
Installation Report
DVIA-MB1000
Ziess
Gemini 2
internal program performance
P172
Contents
MB1000 P172
| Target equipment | Ziess-Gemini 2 |
|---|---|
| Place of installation | N/A |
| Remark | Good Performance |
| END USER | N/A |
| Operator: Choi, HyoungMun | Date of business trip : 17.12.27~17.12.29 |
| Date of setup : 20.07.29 | |
| Date of reporting : 20.07.29 |
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 20.07.23 (THU),
Operator: Daeil System, Manager HyoungMun, Choi
Place of measurement : N/A
Equipment Model: N/A
Measurement conditions and results
Summary of measurement results
Good omnidirectional performance.
MB1000 internal program performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date07-29-2020
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
Ziess
Gemini 2
internal program performance
P172
Related Case Studies

DVIA-M Series
Tier-1 Semiconductor Zeiss Gemini 2 FE-SEM DVIA-MB1000 (231128R4) Installation Report
05-29-2025Read more

DVIA-M Series
YIMO ZEISS Sigma 300 DVIA-MB1000 (P256 / 210604R3) Internal program performance — 2021.11.24
11-24-2021Read more

DVIA-M Series
YIMO THERMO APREO 2S DVIA-MB1000 (P237) Internal program performance — 2021.08.18
08-18-2021Read more