Skip to main content
Installation Report
DVIA-M Series
12-16-2019

Northwest Polytechnical University ZEISS GeminiSEM300 DVIA-MB1000 (P115) trip report — 2019.12.16

DVIA-M Series
Installation Report
DVIA-MB1000
Northwest Polytechnical University
NPU
ZEISS
GeminiSEM300
SEM
China
MB1000 P115

China business trip report (MB1000 P115 Set up)

Target equipment

ZEISS GeminiSEM300

Installation site

1F 126 SEM&TEM Room, Qixiang Building,

Northwest Polytech University

Remarks

Good Performance

End user

Northwest Polytech University

Trip personnel

최성원

Trip date

19.12.12

Report date

19.12.16

Installation result summary

Test DirectionVC-Class
BaseTop
ACTIVEZEG
XGG
YGG

전 방향 성능 양호

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Vibration environment measurement results

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date12-16-2019
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
Northwest Polytechnical University
NPU
ZEISS
GeminiSEM300
SEM
China
MB1000 P115