Installation Report
DVIA-M Series
09-17-2019
Hyundai Steel JEOL JSM-7900F DVIA-MB1000 (MB1000 P138) Installation Report — 2019.09.17
DVIA-M Series
Installation Report
Hyundai Steel
JEOL
JSM-7900F
SEM
DVIA-MB1000
MB1000
P138
Contents
MB1000_P138 현대제철 JEOL
| Target equipment | JSM-7900F |
|---|---|
| Place of installation | 현대제철 기술연구소 1층 |
| Remark | Good Performance |
| END USER | 현대제철 재료분석실 |
| 출장일 : 19.09.17 | |
| 출장자 : 최 형 문 | |
| 작성일 : 19.0917 |
Installation photograph
Overview
After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.
Measurement date: 19.09.17 (THE),
Rater: Daeil System, Manager Choi , Hyoung Moon
Place of measurement : 1층 기술연구소
Equipment Model: JEOL_JSM-7900F
Measurement conditions and results
Summary of measurement results
Good omnidirectional performance and attached VC-Class graph.
MB1000 internal performance measurement result
Z axis
X axis
Y axis
Share this Case Study
Case Study Information
Category
Installation Report
SeriesDVIA-M Series
Date09-17-2019
Tags
DVIA-M Series
Installation Report
Hyundai Steel
JEOL
JSM-7900F
SEM
DVIA-MB1000
MB1000
P138
Related Case Studies
DVIA-M Series
Tier-1 Semiconductor JSM-7800F PRIME DVIA-MB1000 (P46) vibration survey — 2017.07.05
07-05-2017Read more

DVIA-M Series
Shanghai Jiaotong University Thermo Fisher Apreo 2S DVIA-MB1000 (210701R6) Installation Report — 2024.07.06
07-06-2024Read more

DVIA-M Series
FEI NOVA450 DVIA-MB1000 (MB1000 P8) installation worksheet — Seoul Hanyang University — 2020-07-14
07-14-2020Read more