Skip to main content
Installation Report
DVIA-M Series
07-30-2019

South China University of Technology Hitachi Regulus 8100 DVIA-MB1000 (190117R3) Installation Report — 2019.07.30

DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
South China University of Technology
Hitachi Regulus
190117R3
Guangzhou

Installation photograph

Target equipment

Hitachi Regulus 8100

Place of installation

South China University of Technology F1

Remark

Good Performance

END USER

South China University of Technology

Operator: Choi, Sung Won

Date of setup : 19.07.24

Date of reporting : 19.07.30

Date of business trip : 17.12.27~17.12.29

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date: 2019.07.24 (wednesday),

Operator: Daeil System, Manager Sung Won Choi

Place of measurement : 1st Floor, South China University of Technology

Equipment Model: Hitachi Regulus 8100

Measurement conditions and results

Summary of measurement results

Test Condition

VC-Class

Test ConditionVC-Class
ZXY
FloorDDD
Above ActiveFEG

Good omnidirectional performance.

MB1000 internal program performance measurement result

Z axis (MB1000 internal program)

X axis (MB1000 internal program)

Y axis (MB1000 internal program)

Octave Band Result (BASE: Floor, TOP: Above Active)

Z axis (octave band result)

X axis (octave band result)

Y axis (octave band result)

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-30-2019
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
South China University of Technology
Hitachi Regulus
190117R3
Guangzhou