Skip to main content
Installation Report
DVIA-M Series
12-03-2018

Shanghai Institute of Materials Research ZEISS Sigma 500 DVIA-MB1000 (MB1000 P64) Internal program worksheet — 2018.12.03

DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P64
ZEISS
Sigma 500
Shanghai
Materials Research

(Shanghai OPTON MB1000_P64 Set up)

Target equipment

ZEISS Sigma 500

Place of installation

institute of materials, 1th FLOOR

Uniqueness

Good Performance

END USER

Shanghai institute of material research

Date of business trip

Date of business trip : 18.11.27

Business traveler

Business traveler: Choi, HyoungMun

Date Created

Date Created : 18.12.03

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

Measurement date: 2018.11.27 (Tuesday),

Rater

Rater: Daeil System, Manager Choi , Hyoung Moon

Place of measurement

Place of measurement : institute of materials, 1th FLOOR

Equipment Model

Equipment Model: ZEISS Sigma 500

Measurement conditions and results

Summary of measurement results

Test ConditionVC-Class ZVC-Class XVC-Class Y
FloorBEE
Above ActiveFGG

Good omnidirectional performance and attached VC-Class graph.

MB1000 internal program performance measurement result

Z axis

X axis

Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date12-03-2018
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
MB1000
P64
ZEISS
Sigma 500
Shanghai
Materials Research