Skip to main content
Installation Report
DVIA-M Series
03-08-2018

FATRI-UTC ZEISS Gemini DVIA-MB1000 (MB1000 P55) Installation report — 2018.03.08

DVIA-M Series
Installation Report
FATRI-UTC
DVIA-MB1000
MB1000
P55
ZEISS
Gemini

FATRI-UTC (MB1000_P55 Set_Up)

Target equipment

ZEISS-Gemimi

Place of installation

FATRI-UTC 1층 분석실 (크린룸)

Remark

제진대 성능 양호

END USER

FATRI-UTC

Operator

Operator: Choi, HyoungMun

Date of business trip

Date of business trip : 18.03.05~18.03.07

Report written date

Date of reporting : 18.03.08

Overview

After isolator installation, the vibration environment was measured to verify there is no issue using the equipment.

Measurement date

Measurement date: 2018.03.06 (TUE)

Operator: Daeil System, Manager Choi, HyoungMun

Place of measurement

Place of measurement : FATRI-UTC 1층 분석실(크린룸)

Equipment Model

Equipment Model: ZEISS-Gemimi

Measurement conditions and results

Measurement was performed under a general condition (SEM pump running) and under a normal condition (SEM/coater pumps running and personnel walking).

Changes such as peripheral pump operation or foot traffic had little effect on the vibration environment above the isolator.

Summary of measurement results

Test ConditionVC-Class ZVC-Class XVC-Class Y
FloorFFF
Above isolator (active top plate)GGG

Good omnidirectional performance.

VC-Class graphs

MB1000 internal program performance measurement result

Internal program: Z axis

Internal program: X axis

Internal program: Y axis

Octave band result (BASE: floor, TOP: isolator above)

Octave band: Z axis

Octave band: X axis

Octave band: Y axis

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date03-08-2018
Tags
DVIA-M Series
Installation Report
FATRI-UTC
DVIA-MB1000
MB1000
P55
ZEISS
Gemini