Skip to main content
Installation Report
DVIA-M Series
12-08-2017

Geely Chunxiao Ningbo ZEISS Gemini DVIA-MB1000 (170713R5) China trip report — 2017.12.08

DVIA-M Series
Installation Report
DVIA-MB1000
170713R5
MB1000
Geely
Ningbo
ZEISS
Gemini

China business trip report (MB1000 Set up-170713R5)

Installation site photograph

Target equipment

ZIESS Gemini

Installation site

중국 NINGBO

Remark

공장 연구동 1층에 설치.

END USER

Geely Chunxiao Manufacturing Plant

Date of business trip

출장일 : 17.12.06

Operator

출장자 : 임종욱

Report written date

작성일 : 17.12.08

Summary of installation results

Test DirectionVC-Class BaseVC-Class Top
ACTIVEZD
XE
YE

전 방향 성능 양호.

이미지 확인 완료. 고객 만족.

MB1000 internal program performance measurement result

MB1000 internal program — Z axis

MB1000 internal program — X axis

MB1000 internal program — Y axis

Vibration environment measurement results

Vibration environment — Z axis

Vibration environment — X axis

Vibration environment — Y axis

SEM images

SEM image — Floor

SEM image — Active

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date12-08-2017
Tags
DVIA-M Series
Installation Report
DVIA-MB1000
170713R5
MB1000
Geely
Ningbo
ZEISS
Gemini