Installation Report
DVIA-M Series
07-02-2018

Shanghai Institute of Material Research ZEISS Gemini 500 DVIA-MB1000 (171201R1) Installation Report — 2018.07.02

DVIA-M Series
Installation Report
Shanghai Institute of Material Research
DVIA-MB1000
171201R1
ZEISS
Gemini 500
China

(MB1000_171201R1 Set up)

Target equipment

ZEISS-Gemini500

Place of installation

Room 111, Shanghai Institute of material research

Remarks

Good performance

END USER

Shanghai institute of material research

Operator

Operator: Choi, Sung Won

Date of setup

Date of setup : 18.06.29

Date of reporting

Date of reporting : 18.07.02

Overview

After Active mounting, measure the vibration environment to check that there is no problem in using the equipment.

Measurement date

Measurement date: 2018.06.29 (Friday),

Operator: Daeil System, Manager Sung Won Choi

Place of measurement

Place of measurement : Room 111, 1st Floor, Shanghai Institute of materials research

Equipment Model

Equipment Model: ZEISS-Gemini500

Measurement conditions and results

Summary of measurement results

Test ConditionZXY
FloorBEE
Above ActiveFGG

Good omnidirectional performance and attached VC-Class graph.

MB1000 internal program performance measurement result

Z axis - internal program

X axis - internal program

Y axis - internal program

Octave Band Result (BASE: Floor, TOP: Above Active)

Z axis - octave band result

X axis - octave band result

Y axis - octave band result

Share this Case Study

Case Study Information

Category
Installation Report
SeriesDVIA-M Series
Date07-02-2018
Tags
DVIA-M Series
Installation Report
Shanghai Institute of Material Research
DVIA-MB1000
171201R1
ZEISS
Gemini 500
China